Anchor DocsGrounded answersMessengerHandoverOperations

Search the library

Docs are static for now. Use the left navigation to browse.

/
DocsGet started

Get started

Launch checklist

A practical rollout checklist for going from sample widget to production support flow.

Library scope

Org + active site

Answer policy

Grounded or refuse

Escalation

Same-thread handover

Before you launch

Create at least one organisation-level document for shared policy and one site-level document for local questions customers actually ask.

Make sure the site's public origin is on the messenger allowlist and the launcher text matches the brand using the widget.

  • Load approved source material
  • Add the production origin
  • Check launcher copy and visibility

Handover readiness

Confirm a teammate can receive and answer handover conversations. Test that visitor details and the cited attempts appear in Inbox.

If no grounded answer exists, the safe launch condition is refusal plus human routing, not a broader model prompt.

Need the private document portal?

Operators add internal sources from the signed-in desk.

Open document portal